[ad_1]
The fourth part of the Yangshan Port will initially be capable of deal with 4 million TEUs after it enters full operation, which is able to assist consolidate Shanghai portโs place because the worldโs main port.
Up to now, the tools that has been put into trial operation contains 10 bridge cranes, 40 rail-mounted gantry cranes and 50 AGVs. The mission will ultimately be geared up with 26 bridge cranes, 120 rail-mounted gantry cranes and 130 AGVs.
Source link